2ofEverything
New Member
- Joined
- Dec 11, 2013
- Messages
- 11
View attachment Ajax-20131221-00190.jpgFinally went to Lowes today and picked up some lumber. The top of the table isn't going to be completed for maybe another week or two but the main structure is starting to get built. The dimensions have also been changed up a bit.
It's now 7x3 + 4x3 so basically a 7x7 box with a 4x4 corner cut out (if that makes any sense?).
Right now the dimensions of the wood aren't important so I won't confuse anyone but I'll be updating this thread multiple times (with a LOT of pics) over the course of the next few days.
It's now 7x3 + 4x3 so basically a 7x7 box with a 4x4 corner cut out (if that makes any sense?).
Right now the dimensions of the wood aren't important so I won't confuse anyone but I'll be updating this thread multiple times (with a LOT of pics) over the course of the next few days.
Last edited by a moderator: