The original thread is here http://www.tortoiseforum.org/thread-52873-page-5.html
Have been kinda dragging my feet on this enclosure/exhibit. But I started working on it again. Almost ready for the roofer to come out. He already has the material in ordered and in stock for this building. But the door frame is under way. I decided to go with an iron worker/welder to weld up a metal 2x2 steel frame then I will put the sheething and siding on it once the door frame structure is installed. Well Here it is. Kinda fancy for some big tortoises with the corbels and all
Have been kinda dragging my feet on this enclosure/exhibit. But I started working on it again. Almost ready for the roofer to come out. He already has the material in ordered and in stock for this building. But the door frame is under way. I decided to go with an iron worker/welder to weld up a metal 2x2 steel frame then I will put the sheething and siding on it once the door frame structure is installed. Well Here it is. Kinda fancy for some big tortoises with the corbels and all